Educational integration for the students in municipality of Ivailovgrad

The project is directed at creating an integration educational mechanism in the educational institutions, ones who works with students in multicultural setting. With the implementation of this project proposal will be managed methodical upgrade, innovation and stability, for which the inclusion of all partners is a precondition. The project is aimed at meeting the identified needs of children and students from the region - education, lack of equal access, based on imposed segregationist attitudes. This precondition and setting demands a change in the thinking as for the educators for creating a more open awareness for the real public environment with the construction of desegregation mechanism. The project includes 215 students from four schools in the municipality of Ivailovgrad. It includes work with teachers, parents and students, in danger to be excluded for educational problems, is a necessarily for the successful end of those students in the community. Upgrading the educational methodology or a change of the methods is a must be, as well as transition to interactive forms of education, for the aim of more access and assimilation of the learning material. Planned activities in the project are focused entirely on increasing the level of proficiency in Bulgarian language, introducing interactive teaching methods reintegration of students who have left education and extracurricular activities through which to trigger interest among children to regularly attend classes or return to the education system. The project partners are: Com.center "Probuda 1914" - Ivaylovgrad Municipality of Ivaylovgrad Sec.school „Hr.Botev” – Ivaylovgrad Prim.school“S.sv.Kiril i Metody“ Belopoltsi vil. Prim.school“S.sv.Kiril i Metody“ - Jellezino vil. Prim.school“S.sv.Kiril i Metody“ - Svirachi vil. Result: A total of 215 students from ethnic minorities has involved in.

Comments
Leave a comment

Overview

Status Closed (completion date)
Start date 23 Jan, 2017
End date 15 May, 2019
Contract date 23 Jan, 2017
View in UMIS

Financial information

Total cost 462,880.70
Grant 462,880.70
Self finance 0.00
Total paid 373,122.89
EU participation percent 85.0%

Location