It is envisaged to reconstruct the infrastructure to the Sports Complex - Park Garden, Popovo through the reconstruction of the "B" bench. The reconstructed tribune is located on a natural sloping terrain with access from the upper side. It is divided into 16 sectors (B1 to B16). Each sector consists of 10 rows with 9 seats per row or up to 90 seats per sector. The total number of seats in stand C is 1440 pcs. Installation of new plastic seats is planned on each row.
Overview
Status | Terminated (termination date) |
---|---|
Start date | 20 Jan, 2020 |
End date | 20 Jan, 2023 |
Contract date | 20 Jan, 2020 |
Programme
Beneficiary
Financial information
Total cost | 387,339.15 |
---|---|
Grant | 387,339.15 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location