Reconstruction of a heating installation in Primary School “P.R. Slaveykov”, village of Dzhulyunitsa

The main problem of the region is the lack of funding for reconstruction of heating installations in the schools and attracting funds, by which to be improved the condition and the regular usage of the heating installations. It is important to be noted that the stakeholders of the reconstruction of the heating installation are the students and the teachers of Primary School “ P.R. Slaveykov” – Dzhulyunitsa, who use it daily during their classes and other events. In the last years there is a tendency of increase of the costs for heating and the reason for that is the amortized boiler and the bad condition of the heating system. The main problem, which requires the implementation of this project, is the bad condition of the heating system and more specific the amortized two boilers which don’t provide the necessary heating and accumulate heat losses. The project “ Reconstruction of the heating installation of Primary School “ P.R. Slaveykov”, village of Dzhulyunitsa” aims to achieve the following results: • Technological reconstruction for working on gas of the heating system of the school ; • Improving the condition of the boilers and the heating installation of Primary School “P.R. Slaveykov”, Dzhulyunitsa; • Replacing amortized boilers with 350 kW power with new, high-efficiency steel three-way boiler with rated power 350 kW; • Secured conditions for regular exploitation of the boilers and the heating installation and decreased heat losses; • Providing good environment in the offices, the classrooms, the halls, etc. of the school;

Comments
Leave a comment

Overview

Status Terminated (termination date)
Start date 10 Sep, 2020
End date 30 Jun, 2023
Contract date 10 Sep, 2020
View in UMIS

Financial information

Total cost 88,600.00
Grant 88,600.00
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%

Location