The project deals with the construction of an internal structural cable system accompanied by all active and passive devices for the implementation of a unified structured communication system in the building of Devnya Municipality. At present, the building of the municipality has partial equipment acquired in stages. To operate this equipment, cables have been supplied and installed in an unlawful way, hanging unencapsulated, ending largely into network unmanaged switches. The external optical connection is made in a very illegal way optical cables hanging loose and free air and left on the roofs of city hall without being protected from weather. For the purposes of the project due to lack of architectural plans of the building of the municipality has done a detailed survey and preparation of architectural substrates, based on which the compositions project. It reflects the function of the premises and their need for a communication environment.
Overview
Status | Contracted |
---|---|
Start date | 30 Dec, 2019 |
End date | 30 Dec, 2022 |
Contract date | 30 Dec, 2019 |
Programme
Beneficiary
Financial information
Total cost | 155,000.00 |
---|---|
Grant | 129,166.67 |
Self finance | 25,833.33 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location