Major overhaul and change of the purpose of a production building in a sports club, located in UPI I - 673, 57, Obruchishte

The project envisages a major repair and change of the purpose of a production building in a sports club.The object of the investment is the village Obruchishte, Galabovo municipality.There is a one-storey existing production building (bakery) in Regio I-673, with a main entrance from the north and a South Charging Inlet.For the purpose of the project a detailed architectural filming was carried out, reconstruction and modification of the purpose of an existing bakery in a sports club is envisaged.The current reconstruction of the building envisages a change in the functionality of the premises.To do this, all doors and windows will be dismantled and replaced with new ones.In addition, a door will be erected, a partition wall demolished and new ones built.The new object is: Sports Club - consisting of corridor, gym, fitness and equipment, staff room, accessible bathroom, 2 anteroom, 2 toilets, 2 dressing rooms and 2 showers.A ramp with a length of 750 cm and a 5% slope is foreseen to overcome a height of 37.5 cm at the main entrance from the north.It will have a double railing with a height of 60 cm (between 50-75 cm) for use by children and small children and 90 cm (between 85-100 cm) for general use.The handles are continuous and round with a diameter of 5 cm (3-5 cm per norm) and rounded edges.The joinery will be made of PVC profiles and glazing.The roof is an inclined reinforced concrete slab, which will be laid heat insulation, protective screed and 2 layers of bitumen waterproofing (the latter with built-in screed).On the facades there is a thermal insulation system with EPS and a finishing layer - silicate plaster.The necessary equipment will be purchased according to the approved technical specification.

Comments
Leave a comment

Overview

Status Contracted
Start date 18 Sep, 2020
End date 30 Jun, 2023
Contract date 18 Sep, 2020
View in UMIS

Financial information

Total cost 122,017.74
Grant 122,017.74
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%

Location