The project of the municipality of Lyubimets for "Reconstruction and construction of a day care center for the elderly" envisages the reconstruction and construction of a day center for the elderly - the building is owned by the municipal administration of Lyubimets and is located in the town of Lyubimets The technical projects envisage activities under Architecture, Part Heating and Ventilation, Part Construction, Part Electric and Part BK. The construction and assembly works included in the project include installation of external insulation, replacement of joinery, plaster on the façade, roof repair with replacement of tiles and laying of thermal insulation and waterproofing, replacement of gutters, drains and barbecues, replacement of existing metal doors with the exception of door B2 with A1 with double glazing and thermo panel. Replacing the existing door type B2 with a new pre-insulated door, class EI - 60. Dismantling of existing lighting fixtures. Supply and installation of lighting fixtures with energy-saving LED lamps in all premises of the building, motion sensors according to the investment project. - Supply and installation of hot water boiler / biofuel boiler - pellets, incl. pellet burner, water collection and water distribution collectors, expansion vessels, circulating pumps and more. necessary equipment and heat insulation; - Delivery and installation of efficient aluminum radiators, pipes, fittings, etc. necessary equipment for the indoor heating system in the building. Supply and installation of pipes, elbows and others. fittings for an internal pipe distribution system; - Delivery and installation of thermostatic valves of the new radiators in the building; - Delivery and installation of a DHW cylinder. Connect the boiler to the new boiler installation. To be equipped with an electric heater; - Delivery and installation of control equipment and control system according to the outdoor temperature and temperature in the premises.
Overview
Status | Contracted |
---|---|
Start date | 18 May, 2020 |
End date | 18 May, 2023 |
Contract date | 18 May, 2020 |
Programme
Beneficiary
Financial information
Total cost | 333,484.56 |
---|---|
Grant | 333,484.56 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location