Investments in new dental office equipment

The project provides for the purchase of new specialized dental center equipment. The project will be purchased intraoral scanner, diode laser, dental microscope and vertical condensation system with hot gutta-percha. In order to determine the marginal value of each of these instruments, a market survey based on three offers was conducted. For each device, an inquiry was prepared according to its specificity and sent to different companies according to their capacity to supply dental equipment. The limit value for each appliance is determined by the "Lowest price" criterion. For preparing the application documents and the AF, as well as for the project management, a company offering consultancy services in the field of preparation and management of projects under European programs was selected. The consultancy firm's choice is based on the "lowest price" criterion. The purchased equipment will be delivered after the procedure "Selection of a contractor with public invitation", according to the requirements of the OCM 160 and the instructions of the MA of the RDP. As a result of the implementation of the project in the dental center: - two innovative treatment methods will be implemented, - the quality of the dental services will be improved, - patients' discomfort will be reduced in some of the treatment activities, - the range of services offered will be expanded, some of which are new to the territory, incl. and correction of speech problems and swallowing problems in young children. - Provides the ability to track the status of each patient in time, which allows for early detection of problems and their timely treatment. This saves a lot of pain, time and resources for the patient. - Reduction of chemical substances used during treatment will be achieved. - will create 2.5 new jobs As a final result, the project will lead to an increase in the beneficiary's competitiveness as well as to the expansion of its activities.

Comments
Leave a comment

Overview

Status Contracted
Start date 24 Mar, 2022
End date 24 Mar, 2024
Contract date 24 Mar, 2022
View in UMIS

Financial information

Total cost 153,883.80
Grant 115,412.85
Self finance 38,470.95
Total paid 0.00
EU participation percent 90.0%

Location

Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Blagoevgrad (BG413), Razlog