Rehabilitation of a street network in part of the settlements of the Municipality of Straldzha

The project proposal concerns the rehabilitation of streets in eight villages in the municipality of Straldzha: Vodenichane village, Voynika village, Dzinot village, Lozenets village, Lyulin village, Palauzovo village, Parvenets village and Charda village. The investment includes interventions eligible for support under Measure 7.2 of the MFA - Straldja 2016 NGO " Activity 1. "Construction, reconstruction and / or rehabilitation of new and existing municipal roads, streets, sidewalks, and facilities and accessories thereto". Object of the investment proposal are the following streets in the settlements: Dunav Street in the village of Vodenichane, Vasil Kolarov Street in the village of Voynika, Tsar Simeon Street in the village of Dzhinot, "Hadji Dimitar" Str. Lozenets, Str. "Hr. Botev "in the village of Lyulin," Georgi Dimitrov "str. In the village of Palauzovo," Vasil Levski "str. In the village of Parvenets and" Parvi May "str. In the village of Charda. The streets are characterized by very low traffic intensity and very good visibility. The condition of the asphalt concrete pavement is completely compromised, decapitated, with numerous holes and cracks. The main reason for this state of the streets is drainage due to poor leveling, very small longitudinal and transverse slopes. The design solution provides rehabilitation of the pavement, which includes leveling and laying a layer of dense asphalt concrete with an average thickness of 6 cm. In the more compromised sections, the existing asphalt pavement and profiling are planned to be demolished and removed. Existing curbs are retained, decreasing at crossroads to provide an accessible environment for disadvantaged people. In streets where they are missing, curb fitting is planned. The design solution is in line with the current street regulation, state road conditions and regulatory requirements. It is anticipated that the drainage will be superficial, relying mainly on vertical planning.

Comments
Leave a comment

Overview

Status Contracted
Start date 03 Aug, 2020
End date 30 Jun, 2023
Contract date 03 Aug, 2020
View in UMIS

Financial information

Total cost 255,726.56
Grant 255,726.56
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%

Location