This project proposal aims to solve the issue of the heating of the Chitalishte "Vazrazhdane 1926", village of Zimnitsa by providing for the construction of a heating system only for the public hall as the chitalishte is in good internal architectural condition and the technical solution treats the newly built installation to pass only through the basement premises , as they are currently unusable and the drilling of holes will not damage the representative part of the saloon. The technical solution for heating the saloon is based on detailed heat engineering calculations for the winter operating regime of the installation. A pellet heating boiler with a capacity of 40-80 kW is planned to cover heat losses in the salon. (easy to operate and manage) that is mounted in the basement under the stage of the gym. The chimney of the boiler is mounted externally on the façade at the back of the building, insulating and strengthening against the wall and the roof. The pipe network is carried out in a basement room under the stage and on both sides of the wall, which is mounted on two powerhouse units with a power of 2 x 40 kW. with the direction of the supply air to the saloon. On one vertical riser a deflection is made for a 10 kW hot air unit. behind the curtains with direction only for the stage. In this way, all pipe openings are made in areas that are not visible from the public area and dominate the repair and maintenance works after the installation.
Overview
Status | Contracted |
---|---|
Start date | 16 Sep, 2020 |
End date | 30 Jun, 2023 |
Contract date | 16 Sep, 2020 |
Programme
Beneficiary
Financial information
Total cost | 26,175.10 |
---|---|
Grant | 26,175.10 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location