"Rehabilitation of a street in the village of Chernoochene, Black Mountain at mt. 96 to o. 215g and the construction of street lighting "

The state of the inner street network in the village of Chernoochene is generally not good and requires repairs and rehabilitation activities. The projected situation envisages the rehabilitation of a street from the Ot96 to the Ot215, which will provide the transport services of the properties in the plot. A pedestrian route will be created from the Ot215 to the Ot215g, which will connect the central part of the village with the riverbed of the Peperek River. A pedestrian accessible area will be formed in the riverside area of the village. The investment project envisages the following activities: Dimensions: The street has no fixed gauge on the traffic lane, as it is kept varying from 5.00 m. up to 6,20m There is a separate pedestrian crossing from BD215 to BD215. The dimensions of this section and 3.00m, with the traffic lane being 2.40m. Sidewalks: They will be entirely located along the street from the Ot215 to the Ot215g. The width is 2,40m. It is envisaged the application of crushed stone base, bitumen crushed stone layer and binder layers and dense asphalt mixture. Road surfaces: The existing state of the existing pavements in the plot envisages deterioration. Excavation of earth masses, profiling, compacting and subsequent construction of a new road construction, according to the details, is foreseen. The new level solution is in line with the level of the correction of the Peperek River as and the entrances to adjacent buildings. Drainage: The street has an established rainwater drainage system. The present design project aims to improve the condition of the coating, the uniformity and the comfort of the passage. This also treats the drainage of the plot. The proper functioning of the street section is ensured by surface water removal and water collection in rainwater shafts. Category of construction according to Art. 137, para 1, item 4 of the Territory Management Act: Category IV Area of development: - 990.53m2

Comments
Leave a comment

Overview

Status Contracted
Start date 16 Jun, 2021
End date 30 Jun, 2023
Contract date 16 Jun, 2021
View in UMIS

Financial information

Total cost 110,283.18
Grant 110,283.18
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%

Location

Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Kardzhali (BG425), Chernoochene, Chernoochene