Constructing of a sport complex - a pool in land IX, quarter 24, Slivnitsa town

The project proposal provides for the construction of a standard 10 m (five corridor) drilling pool and a length of 16.66 m (6 lengths are 100 m). In the pool you can train up to 30 people. The garments are designed to ensure a quick conversion of up to 14 women and more men at the same time, which will ensure a smooth change of the training group. At elevation 0.00m. - first floor: entrance hall, accessible "toilet", "bed linen" and "bed linen" (each with 5 people 28 wardrobes and two toilets) "Pool Hall" with exits to the yard where there is a playground for beach volleyball . At elevation - 2.80m. It is envisaged that the foundations of the building will not be retained with backfill, and that the obtained premises will benefit from a future project. A project for a sports complex with a covered swimming pool, 24 according to the regulation plan of the town of Slivnitsa was developed for two stages. The steps are clearly described and distinguished by individual parts. The first stage (the current project) is a sample and an integral part of the overall design - it is developed for clarity. In the first stage the whole reinforced concrete structure of the building is executed. The steel structure to cover the pool, the thermal panels, the surrounding walls and the glazing of the pool and the foyer will be carried out in a second phase. After the first stage, the pool will be able to function as an open-air swimming pool with fully finished chambers. The first stage will be equipped with swimming pools, which will provide summer use of the training pool

Comments
Leave a comment

Overview

Status Contracted
Start date 30 Oct, 2019
End date 30 Oct, 2022
Contract date 30 Oct, 2019
View in UMIS

Financial information

Total cost 269,916.05
Grant 269,916.05
Self finance 0.00
Total paid 134,777.50
EU participation percent 90.0%

Location