"Strengthening streets" in the village of Bankovski, Kirkovo municipality - first stage

The project proposal of the Municipality of Kirkovo envisages the development of the street network in the village of Benkovski, including sidewalks. Seven streets are included in the project as follows: A street with a point of 194 to a street of 232, a street of 232 to 187, a street of 208 to 256 , a street with 238 to 239, a street with p. 167 to p.151, street with a 229 to p. 230 and a street with p. 244 up to 243 with a total length of 1045.54 m. The implementation of the project aims to cease the process of demolition of the existing ballast and asphalt pavement and to guarantee the load-bearing capacity, the flatness and the drainage from the surface water.

Comments
Leave a comment

Overview

Status Contracted
Start date 19 Oct, 2019
End date 19 Sep, 2022
Contract date 19 Oct, 2019
View in UMIS

Financial information

Total cost 391,120.34
Grant 391,120.34
Self finance 0.00
Total paid 192,918.18
EU participation percent 90.0%

Location