The project aimed to improving the conditions for keeping animals on the farm of Vesselin Bodurov, through a major renovation of the building stock, namely major overhaul and replacement of the roof of an existing sheep farm and a complementary building located in the PD № 02141.24.48 on the land of Bagrilci, Krumovgrad municipality, Kardzhali district. Farmer Veselin Bodurov was registered as such in the Regional Directorate "Agriculture", Kardzhali in 2009. The farm has 241 sheep, including 228 for meat. The building stock in which the sheep are grown is in need of an emergency repair of the roof of the main building - 603 sq.m in which the sheep are kept, as well as the repair of an additional business building of 42 sq. M. The applicant is not registered for VAT. Apply for the amount of BGN 98 271.10. The grant for which she applied is BGN 58 962.66 - 60%. The property is located in a disadvantaged area other than mountainous. The costs claimed for funding are construction works 2G; construction works 4G and are included in the List of certain reference prices - Annex 27 and Annex 27A of the Application Conditions.
Overview
Status | Contracted |
---|---|
Start date | 28 Jul, 2021 |
End date | 30 Jun, 2023 |
Contract date | 28 Jul, 2021 |
Programme
Beneficiary
Financial information
Total cost | 98,871.10 |
---|---|
Grant | 59,322.66 |
Self finance | 39,548.44 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location