The subject of the project offer is the renewal of areas for wide public use in the town of Momchilgrad,I-st regulated plot of 6th neighborhood.The project foresees the building of an alley net and a composition of the tree-bush vegetation as an unifying and a constructive element of the inside space.On the territory of the object there are single deciduous trees and it is foreseen their preservation and their aesthetically implementation into the outlook.It is also foreseen the planting of vegetation of a short type and the building of a rock garden with the characteristic rocks and plants.In the project is included the construction of the place around the monument of Momchil hell-new steps,flooring and a differentiation of places for relaxation.Behind the monument will be built a green zone.There will be formed places with park equipment-benches,trashes,signboards.As an assembled point it is foreseen the building of a fountain.The whole image of the place will be added with the proper lighting.The aim is to be created a representative and aesthetically place with functionality and zones for relaxation.The object is available for people in a disadvantaged position.It is foreseen to be put limiters where the circularly is.The newcomer flooring of pavements connects the existing pavement of"Gumurdjinska"str.with the pavement of "Makaza" blvd.It is foreseen the building of an automatic underground irrigation system which will be powered up by the public water supply network.The grass and the flower places will be watered by the built in different models of underground sinking sprinklers which should be mounted on the tube net,built of polyethylene tubes and fittings of the type"quick connection"and separated in individual irrigated sectors.Every single sector will be managed of electromagnetic valve which will be placed in a decorative shaft.By the modules the watering is independent with the wanted and fixed hour and a length of the watering for every single sector.
Overview
Status | Terminated (termination date) |
---|---|
Start date | 13 Nov, 2020 |
End date | 30 Jun, 2023 |
Contract date | 13 Nov, 2020 |
Programme
Beneficiary
Financial information
Total cost | 50,000.00 |
---|---|
Grant | 50,000.00 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location