Construction of streets "Atanas Manchev", "Benkovski" and "Septemvriitsi"

The project "Reconstruction of Streets" Atanas Manchev, Benkovski and Septemvriitsi in the town of Sredets meets the conditions of procedure BG06RDNP001-19.168 "LAG Sredets - Submeasure 7.2"Investments in the creation, improvement or expansion of all types of small scale infrastructure "from Measure 7" Main services and renovation of rural villages ", under the RDP 2014-2020, rom the LOG SREP strategy. The activities are in line with the priorities of the ODA of the Sredets 2014-2020 Municipality, namely: Objective 3: Integrated development of the municipal territory and its adequate infrastructure provision, Measure2: Overall improvement of the municipal technical and business infrastructure. The subjects covered by this project proposal are located in the town of Sredets with the following parameters: "Septemvriitsi" street starts from the"T" intersection with Malchika Square at km 0+000.00 and ends at the "T" junction with Atanas Manchev at km 0 + 167,12, with a length of 167.12m.The length of "Septemvriitsi" Str. Is 167.12m. The Benkovski" and "Atanas Manchev" shafts are developed as a common axis and a longitudinal profile. The beginning is from the "T" shaped crossroad with "Osmi mart" street at km 0 + 000.00and ends at the "T" junction with "Septemvriytsi" street at km 0+ 00.98 with a length of 300.98m. he length of Atanas Manchev and Benkovski str. Is 300,98m. The streets are in very bad condition. Septemvriytsi Street is built from existing pavements, which are largely missing. There are pavements and curbs on both sides of the street. "Benkovski" and "Atanas Manchev" streets are with asphalt concrete flooring, which has been destroyed in many places and slopes and cracks are observed. There are pavements and curbs on both sides of the street. Activities include: Dismantling and installing curbs, removing granite pavers, Laying a road base from unsorted crushed stone, milling asphalt pavers, asphalt works, road construction and traffic organization work.

Comments
Leave a comment

Overview

Status Contracted
Start date 22 May, 2020
End date 22 May, 2023
Contract date 22 May, 2020
View in UMIS

Financial information

Total cost 172,872.26
Grant 172,872.26
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%

Location