The project proposal envisages the reconstruction of a square space and the delivery of two stops for the needs of public transport, which are located in front of the bus station and the section of Ivan Vazov Blvd. to the entrance to the central garden. The square space is a point of overlap of the third-class republican third-class road and the fourth-class municipal road. Part of the space is used to park the vehicle and the bus station as it has bus stops to connect with other settlements. The project envisages the construction of new curbs and sidewalks, the construction of an island for waiting passengers on the square, milling of the existing pavement and reprocessing and street markings. The milling is provided from zero to four centimeter, and the re-coating is from four to six centimeter. With asphalt concrete one thousand two hundred. Pavement flooring is provided for one tonne load, pavement tiles five centimeter, cement sand solution three centimeter and unsorted crushed stone sixteen centimeter. Vertical planning takes into account the existing pavement and the first stage is to make the curbs and sidewalks and in the second stage it is planned to mow the existing pavement and reprocess the whole object. Fifteen/twenty-five/fifty concrete curbs are foreseen on concrete twenty-five-twenty-five concrete class B twelve and five concrete. Pavement pavement with wheel load for one tonne, five centimeter concrete slabs, three centimeter cement-mortar solution, sixteen centimeter base of unsorted crushed stone E two hundred fifty and earth foundation E thirty meter. A reduction in the curbs in the area of pedestrian crossings is foreseen.
Overview
Status | Contracted |
---|---|
Start date | 10 Feb, 2021 |
End date | 10 Feb, 2023 |
Contract date | 10 Feb, 2021 |
Programme
Beneficiary
Financial information
Total cost | 61,304.54 |
---|---|
Grant | 61,304.54 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location