The project represents an investment in the reconstruction and rehabilitation of the roads of Municipality Tundzha and includes three streets of the municipal road network in the villages of Botevo and Tenevo: 1. "Strandzha "str. from axis point 131 to 132, Botevo village The width of Strandzha Street in Botevo village is planned to be 6,00 m (2 lanes for a width of 3,00 m), the sidewalk is 1,50 m wide, at the junctions designed curved curves have radii from 3 m to 6 m. At crossroads, the project provides for sloping sidewalks, which improves accessibility in these sections. At the junction at the axis point 131, the construction of a raised pedestrian walkway is envisaged to ensure the safe crossing of the pedestrians in this area and also as a means of limiting the leaking water from the other street. 2. "P. Volov " str. from axis point 203 to 143 and "Pop Andrew" str. from axis point 204 to 205, Tenevo village It is foreseen the width of the canvas on P.Volov Str. In the village of Tenve along the whole length and 5.00 m., The sidewalk has a minimum width of 1.00 m. At crossroads, the curved curves have a radius of 3.5 up to 16 m. "Pop Andrei" str. in Tenevo village is planned to be 4.50 m wide and a 1.00 m minimum pavement width. At crossroads, the project envisages chiselage of the pavements, which improves accessibility of these areas. With the implementation of project activities for renovation of the directional infrastructure will create attractive living conditions for the local population, wide range and accessibility to social, cultural and educational services and development of the local economy.
Overview
Status | Contracted |
---|---|
Start date | 30 Dec, 2020 |
End date | 30 Jun, 2023 |
Contract date | 30 Dec, 2020 |
Programme
Beneficiary
Financial information
Total cost | 148,778.43 |
---|---|
Grant | 148,778.43 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location