Rehabilitation and reconstruction of streets, sidewalks and streets equipment and accessories to them in Hadzhidimovo, Hadjidimovo municipality - Ilindentsi Street

Rehabilitation and reconstruction of streets, sidewalks and their facilities and accessories in the town of Hadjidimovo, Hadjidimovo municipality - Ilindentsi Street with total length of 515.46 m, area of asphalt pavement 3 140 sq.m. and an area of pavement - 1 170 sq. m. (according to part of the road of the Project). At present, the asphalt concrete flooring on Ilindentsi Street in the area of ​​OT. 177 to O.T. The 277a is in poor condition, numerous pins and trenches are executed, resulting in damage to its integrity, and this has adversely affected the load-bearing capacity and the roughness of the roadway. Several single and meshed cracks are seen along the street. Longitudinal and transverse slopes are uneven, resulting in poor drainage. The existing sidewalks are made of concrete slabs that are damped, broken and in some places missing. According to the functional classification, the street is from V-th grade, from the secondary street network. The predicted speed is 50 km / h. The width of the traffic lane is constant - two lanes for 2,750 meters and sidewalks with varying widths between the intersections. With the implementation of the project activities, a complete replacement of the pavement and sidewalks will be carried out, ensuring good drainage / correction of the level of the existing revision and rainwater shafts and stopcocks, ensuring traffic safety. Following the implementation of the project, the new infrastructure will contribute to reducing noise levels, dusting and reducing hydrocarbon emissions in the atmosphere. Improved road surface indicators will contribute to reducing the cost of depreciation of vehicles and machinery to the general public. Quality floorings also help to develop the appearance and tourist potential of the municipality. Good flooring helps stimulate bicycle transport for work, relaxation and sport activity.

Comments
Leave a comment

Overview

Status Contracted
Start date 24 Jun, 2020
End date 24 Jun, 2023
Contract date 24 Jun, 2020
View in UMIS

Financial information

Total cost 313,702.70
Grant 313,702.70
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%