"Construction of a playground in Dolni Dabnik"

Sport is an extremely important element of the education of young people. He formed their physical and sports culture and prepare them for an active and healthy lifestyle. With the implementation of the project will increase the number of people practicing sports, which in turn will increase health awareness and vital standard. Conditions will be created to implement part of the curriculum in schools and kindergartens in the city. Through the commitment of young people at sporting events and training will be achieved and social outcomes. The playground will be built in place of the self-destruct building located in the central park of the town of Dolni Dubnik. It is envisaged that construction of a playground with dimensions of 40 m 20 m . on concrete pavement will be laid udaropaglashtashta such type of "artificial grass". The playing field will be lined for a game of mini soccer, handball, basketball and volleyball. Provides equipment and equipment for four different sports: volleyball net, multi-door mini football with basketball superstructure and doors for handball. The fence of the site will be ready panels wire in a metal frame. Flooring, fences, entrances and facilities at the site will meet the requirements of Regulation №1 / 12.01.2009 years. The lighting of the site will be filled by newly lighting near play areas. The alleys around the site and the entire area covered by the project will be implemented by visible concrete curbs 15/35/50 cm. And colored concrete slabs with dimensions not less than 30/30 cm. Driveways will be placed wooden benches and bins waste. Possibly will keep as much of the natural vegetation around the site. They will be provided for events grassing and planting of appropriate tree species. From the south on the higher side of the site will provide at least two rows of benches - stands for visitors.

Comments
Leave a comment

Overview

Status Terminated (termination date)
Start date 15 Jan, 2021
End date 30 Jun, 2023
Contract date 15 Jan, 2021
View in UMIS

Financial information

Total cost 161,686.32
Grant 161,686.32
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%

Location