"Construction of playgrounds in Gorna Mitropolia, Podem, Bregare and Riben, Municipality of Dolna Mitropolia"

The project proposal includes the construction of new playgrounds in four settlements on the territory of the municipality. The sites will be located on suitable grounds, open, publicly accessible and equipped with appropriate facilities and facilities for play and recreation. The activities envisaged are the cleaning of the adjacent terrain, the laying of the base with suitable flooring and the installation of children's outdoor play equipment on shock absorbing rubber flooring, ensuring human safety. The rest of the playground envisages grassing and planting vegetation and creating a place for recreation. There will be children's facilities, 5 benches and 4 waste bins. It is planned to install a single combined children's facility with two cottages-terraces, an educational game, a double slide of 100 cm and an inclined climbing wall with steps for children from 2-6 years.There will be a double combined pendulum swing for different age category of children - 0-3d and 3-12d; a number of sports equipment for the balance - a baby climbing ladder, consisting of a vertical tubular ladder, a vertical cable ladder, a climbing rope, a vertical alpine wall, gymnastic rings, a horizontal rope platform and a hanger. The elements of the playground furnishings will be arranged so as not to impede and impede the play and access of disabled users and associates. Around the play facilities and elements of the play facilities intended for users with disabilities, there will be free space sufficient for wheelchair maneuvering, subject to regulatory requirements for building an accessible environment. The playground will be surrounded by a colored metal fence and wooden elements with a maximum width of 1.20m, with two entrances.

Comments
Leave a comment

Overview

Status Contracted
Start date 15 Jan, 2021
End date 30 Jun, 2023
Contract date 15 Jan, 2021
View in UMIS

Financial information

Total cost 130,050.28
Grant 130,050.28
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%

Location