The present project is for the construction of greenhouses in their own property - levels of 10 acres in the land of Slivo pole, Slivo pole municipality, Ruse district. The intention is to build 24 greenhouses with dimensions: 8.0m wide. ; Length 24.50m and Height 3.50m. The coating is polyethylene with UV protection. The greenhouses are arranged in such a way that the easements on both sides of the power lines are observed, as well as the minimum permissible distances from the borders to the neighboring properties. Each greenhouse has a built-up area of 196 square meters. The greenhouses are of the Tunnel type. The supporting elements are the arched farms, which are monolithic in single steps in the earth base. The farms are approximately 160 cm apart. They are spatially supported by spacers and vertical connections. The coating is light polyethylene. The farms are designed to take on the proper load of their own weight, wind, and snow.
Overview
Status | Contracted |
---|---|
Start date | 29 Apr, 2022 |
End date | 29 Apr, 2025 |
Contract date | 29 Apr, 2022 |
Programme
Beneficiary
Financial information
Total cost | 99,648.00 |
---|---|
Grant | 59,788.80 |
Self finance | 39,859.20 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location