The current project proposal's main objective are the curb lines on the renewed "Hristo Botev str. in Chomakovtsi village, Cherven Briag municipality and the directions to the crossing streets. The chosen points will be at the asphalt level, curb submerged level and at canted curbs at respective points. All entries to private homes on the street are shot with all fence bends. There are water-collecting lattices at some predefined places on the road, which are not enough at this point. The existing sidewalk pavement has been destroyed with the exception of that in front of the school, which is planned to be kept. The project's vertical planning is in accordance with the task and the existing village infrastructure situation. The main parameters are the curb submerged level and private homes' entrances. The projected sidewalks' width is 1.64 m. The green areas are going to be divided at some places where there should be vehicle entrance to the private homes and at the submerged curbs. Mainly the green areas will be limited by garden type curbs, detailly described in a separate part of the project.The projected sidewalk pavement will be of concrete slabs over a moister concrete B15 class cover. The soil will compacted with a motor vibrator and aligned with sand.
Overview
Status | Contracted |
---|---|
Start date | 18 Jan, 2022 |
End date | 30 Jun, 2023 |
Contract date | 18 Jan, 2022 |
Programme
Beneficiary
Financial information
Total cost | 158,873.18 |
---|---|
Grant | 158,873.18 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location