INVESTMENTS FOR PUBLIC USE OF INFRASTRUCTURE, TOURIST INFRASTRUCTURE AND SMALL-SCALE TOURIST INFRASTRUCTURE IN THE TERRITORY OF SADOVETS VILLAGE, MUNICIPALITY OF DOLNI DABNIK

This Project Proposal INVESTMENTS FOR PUBLIC USE IN INFRASTRUCTURE, TOURIST INFRASTRUCTURE AND SMALL-SCALE TOURIST INFRASTRUCTURE ON THE TERRITORY OF THE VILLAGE OF SADOVETS, MUNICIPALITY OF DOLNI DABNIK is in accordance with the conditions of selection procedure No: BG06RDNP001-19.360, measure 7.5 of the community-led Local Development Strategy of the local initiative group (LIG) “LIG Dolna Mitropolia - Dolni Dabnik”. This Local Development Strategy is called “INVESTMENTS FOR PUBLIC USE IN INFRASTRUCTURE, TOURIST INFRASTRUCTURE AND SMALL-SCALE TOURIST INFRASTRUCTURE”, with the candidate, a NPA for Public Benefit “Tourist Association Studenets” in the village of Sadovets, Dolni Dabnik municipality. Under the Technical Design Project (TDP) under Ordinance № 4 and on the basis of Article 154 of the Spatial Development Act, work are defined: І. STAGE 1: The urgent construction and installation works according to the provided funds include 3 sub-sites: 1. PARTIAL RECONSTRUCTION OF THE EXISTING BUILDING AS A TOURIST CENTER WITH THE MOST URGENT CONSTRUCTION ACTIVITIES. Construction and installation works are in part of the existing building, Regulated plot XII 1274, quarter 140, zone: first, which is highly depreciated. Urgent activities in Structures, Architecture, Plumbing, Electricity, Efficiency with a TOTAL AREA OF 267.35 m2. 2. ECO-TRAIL 2: Eco-trail 2 is the smaller one with a length of 725 meters and is a connection to the existing Cable Bridge over the Vit River. The main concept is a NATURAL WAY AS A MINIMUM INTERFERENCE IN A PROTECTED NATURAL ENVIRONMENT, ACCORDING TO Art. 56 Act. 3. REPAIR OF AN EXISTING CABLE BRIDGE OVER THE VIT RIVER, STUDENETS locality, SADOVETS village. The bridge is a signature fixture of an extremely beautiful area. It is functional, connecting the two beautiful banks of the river, and it is used by locals. Total investment cost by STAGE 1 is BGN 150,000.00 with VAT. THIS IS THE STAGE AT WHICH WE APPLY WITH THE CURRENT PP !

Comments
Leave a comment

Overview

Status Contracted
Start date 03 Feb, 2022
End date 30 Jun, 2025
Contract date 03 Feb, 2022
View in UMIS

Financial information

Total cost 145,500.00
Grant 145,500.00
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%

Location