This project proposal envisages the implementation of "Reconstruction of the sidewalk network, parallel to road III-813 in the town of Godech - from ot. 403 to ot. 320 and road III - 8132 - from ot. 320 to ot. item 175 "- stage IV (from item 164 to item 175). The sidewalks are adjacent to streets that connect the town of Godech with roads from the national road network III-813 and III - 8132. The aim of the project is to reconstruct and repair the sidewalk network in the town of Godech parallel to road III-813 and III - 8132 from o .t. 164 to ot. 175. The following activities are planned: - breaking of the old asphalt pavement; - making a base for a new asphalt pavement - crushed stone - fraction 0/40 mm - 20 cm .; - delivery and laying of concrete / garden / curbs; - construction of concrete strips - sidewalk space / transverse in the asphalt pavement /; - delivery and laying of new asphalt pavement with a thickness of 4 cm; - grassing of green areas - landscaping.
Overview
Status | Contracted |
---|---|
Start date | 05 Jan, 2021 |
End date | 30 Jun, 2023 |
Contract date | 05 Jan, 2021 |
Programme
Beneficiary
Financial information
Total cost | 149,976.60 |
---|---|
Grant | 149,348.46 |
Self finance | 628.14 |
Total paid | 0.00 |
EU participation percent | 90.0% |
Location