"Rehabilitation and reconstruction of streets, sidewalks and the facilities and accessories to them in the town of Hadjidimovo, Hadjidimovo municipality ”subproject - Peyo Yavorov Street by OT 309 to OT 314 "

Within the framework of the present project Rehabilitation and reconstruction of streets, sidewalks and the facilities and accessories to them will be carried out in the town of Hadjidimovo, Hadjidimovo municipality, subproject - Peyo Yavorov Street by OT 309 to OT 314“. The main technical elements of the street are: Length -177.64 m, area of ​​the asphalt pavement - 914 sq.m. and area of ​​the pavement - 558 sq. m. In the section from OT 309 to OT 314 provides for reconstruction along the entire width of the roadway. The complete replacement of the pavement includes: making a base of crushed stone - 35 cm and laying a layer of dense asphalt concrete - b cm. It is envisaged a complete replacement of the street curbs and the pavement, as well as lowering of the sidewalks and curbs in the area of ​​the intersections in order to provide an accessible environment for traffic of people with disabilities, according to Ordinance, 4 of 2009 on design, implementation and maintenance of the constructions in accordance with the requirements for accessible environment for the population, including for the people with disabilities. Through the implementation of this project it is planned to complete the pavement and sidewalks of the street, as well as to ensure better drainage (adjusting the level of existing inspection and rainwater manholes and shut-off valves), ensuring safety in traffic organization. After the implementation of the project, the new infrastructure will contribute to the reduction of noise levels, dust and reduction of hydrocarbon emissions into the atmosphere. Improved road performance will help reduce the cost to the public of depreciation of vehicles and machinery.

Comments
Leave a comment

Overview

Status Contracted
Start date 28 Apr, 2021
End date 30 Jun, 2023
Contract date 28 Apr, 2021
View in UMIS

Financial information

Total cost 83,769.91
Grant 83,769.91
Self finance 0.00
Total paid 0.00
EU participation percent 90.0%