Construction of a new production utility building and purchase of technological equipment for processing of biological agricultural raw materials and manufacturing of biological finished products

CONSTRCTION OF NEW UTILITY BILDING AND PURCHASE OFMACNINES AND TECNOLOGICALEQUIPMENT FOR PROCESSIING OF BIOLOGICALLY CERTIFIED UN-PROCESSED AGROCULTURAL PRODUCTS FROM THE CATEGORY OF FRUITS AND VEGETMMABLES /RAW KERNELS OF PRODUCTS PACKINGS FOR CONSUMPTION.ALL UTILITY BILDING WILL BE EQUIPPED WITH AN AIR-CONDITIONING SYSTEM AND STORAGE ACCOMODATIONS /COOL STORE HOUSES/FOR THE PRESERVATION OF THE AGROCULTURAL RAW MATERIAL S AND THE FINISHED PRODUCTS.THE PRODUCTION WILL BE STRICKTLI -100% FOR PROCESSING OF BIOLOGICAL AGROCULTURAL RAW MATERIALS.THE DEGREE OF MECHANIZATION AND AUTOMATION WILL BE APPROXIMATELY 80%.THE UTILITY BILDING HAVE ONE FLOOR WITH COMBINED CONSTRUCTION / WITH MONOLYTIC SE;I-UNDER GROUND FLOOR/.THE DIMENSIONS OF THE CONSTRUCTION HAVE BEEN CALCULATED TO COMPLI WITH REQUIREMENTS OF EUROCODE NR.2; EUROCODE NR.3; EUROCODE NR.4; EUROCODE NR.7 AND EUROCODE NR.8 IN ORDER TO ASSURE THE NORMAL FUNCTIONING OF THE BUILDING PROJECT AND ITS ECOLOGIAL FRAME UP THERE WILL BE ACCOMPLISHED;VERTICAL PLANNING WITH PLATFORM MESHWORKS,GRASSING AND FRETWORK FENCE.THE MACHINES AND TECNOLOGICALEQUIPMENTQ,STIPULATED FOR PURCHASE:1.MACHINES FOR LOCAL TRANSPORT.2.SYSTEM FOR PRODUCTION OF COMRESSED AIR AND SYSTEM FOR PRODUCTION OF NITROGEN.3.REFRIGERATING INSTALLATION FOR THE STOREHOUSES.THE CAPACITY OF THE TECHNOLOGICAL EQUIPMENT IS CALCULATED ON THE BASE OF THE NECESSITIES OF THE MANUFACTURER.

Comments
Leave a comment

Overview

Status Contracted
Start date 27 May, 2022
End date 15 Sep, 2023
Contract date 27 May, 2022
View in UMIS

Financial information

Total cost 3,900,062.64
Grant 1,950,031.31
Self finance 1,950,031.33
Total paid 0.00
EU participation percent 75.0%

Location

Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia cap. (BG411), Sofia Cap., Lozen