Application by procedure through selection of project proposals No BG06RDNP001-4.002 under sub-measure 4.1.2. "Investments in Agricultural Farms under Thematic Subprogramme for Development of Small Farms" under Measure 4. "Investments in Material Assets" for the purchase of tractor LS model XR250 and wheel loader brand STOLL model FC450P

The investment amounts to a total of BGN 48600,00 with VAT and includes the purchase of: LS model XR50 tractor of BGN 40,200.00 with VAT and a front loader of 8400 BGN with VAT. The technique will be bought by SATNET Ltd, the town of Karlovo. The good relationship between price and quality features of the technique and the available spare parts network are the main criteria for choosing the supplier as well as the afore mentioned brands and models of agricultural machinery. This agricultural machine corresponds to the maximum extent of the needs and opportunities of the Albena Hristanva Arnaudova farm for the development of the production.The technique covered by the investment will be exclusively used to process farmland on the farm and to serve the sheep farm's needs. The main subsidy is 60% of total eligible costs with a 10% surcharge, as the activity develops entirely on the territory of a mountainous area or a total of 70%. For realization of the project Albena Hristanova Arnaudova has provided its own funds, 100% of the investment costs.The economic effect of purchasing the new equipment on the business is proven in the current business plan. The purchase of new modern equipment will reduce the cost of external services, and hence mechanized processing and unit cost in general. This in turn leads to higher profitability of production. After realization of the investment, it is envisaged to restrict the dependence on performing external mechanized or manual labor whose use adversely affects the economic development of the farm, its profitability from agricultural activity and the quality of the production.

Comments
Leave a comment

Overview

Status Terminated (termination date)
Start date 08 Mar, 2021
End date 08 Mar, 2023
Contract date 08 Mar, 2021
View in UMIS

Financial information

Total cost 48,600.00
Grant 34,020.00
Self finance 14,580.00
Total paid 0.00
EU participation percent 85.0%