Purchase of tractor with attachment - plow, rotor cutter and shredder

1. The investments in this project proposal are as follows: Purchase of a 35-hp cab. and attachment to it: Three-body plow with a working width of 60 cm and a working depth of 15-30 cm; Rotary milling machine with 28 pcs. working bodies, working width 145 cm and working depth 15 cm; Shredder with a working width of 150 cm. The total value of the investment is 41 860.00 BGN without VAT and 50 232.00 BGN with VAT. As the applicant is not registered under the VAT Act, the amount of the investment applied for is the VAT value or BGN 50 232.00. The expected financial support is 80% of the investment value (40 185.60 BGN), as the applicant meets the the criteria for "Young farmer" and his farm are located entirely in a mountainous area. 2. The technique and inventory subject to the planned investment shall be consistent with the operation of the holding. With the implementation of the project, the applicant is expected to: - equip himself with the necessary physical capital for his holding because he does not currently have his own agricultural machinery; - reduce the cost of external services - on the farm to coin, external mechanized services are used, which leads to high costs and often problems arise with the inappropriate carrying out of the necessary agro-technical measures; - improve working conditions - By purchasing the tractor and the attachment, manual work will be reduced as much of the perennial planting operations will be mechanized;- increase the efficiency of the farm - the use of the tractor and the attachment to it will reduce the time required to carry out the necessary agro-technical measures for growing perennials, reduce the losses of plant protection products and the transport of produce.

Comments
Leave a comment

Overview

Status Contracted
Start date 23 Mar, 2021
End date 23 Mar, 2023
Contract date 23 Mar, 2021
View in UMIS

Financial information

Total cost 48,197.03
Grant 38,557.62
Self finance 9,639.41
Total paid 0.00
EU participation percent 85.0%

Location