The current project proposal of agricultural producer(AP) Ivaylo Nikolaev Yordanov is related to the construction of a new livestock farm for breeding 1950 fattened pigs on the land of the village of Vetren, municipality. Silistra. The investment intention of the applicant includes the implementation of: Subproject 1 Buildings for animal husbandry Subproject 2 Boiler room. For heating of Building 1 and Building 2. The heat supply will be from a boiler installation, located in a separate technical room, supplied by a pellet boiler; Subproject 3 Box for transportation, Subproject 4 Toroem lagoon fertilizer storage tank located on a concrete base Subproject 5 Disinfection site, Subproject 6 Bunkers for ready feed; Subproject 7 Double fence to improve the biosecurity of the complex; Subproject 8 Platform grid. The object of this project proposal, which applies for financial support under sub-measure 4.1 Investments in agricultural holdings are the activities of: Subproject 1 Buildings for animal husbandry and in particular the construction and assembly works for construction and overhaul of: Building 1 - parts Architecture, Structures, Plumbing; Building 2 - parts Architecture, Constructions, Plumbing; Building 3 - parts Architecture, Constructions, Plumbing; Building 4 - parts Architecture, Constructions, Plumbing; Subproject 2 Boiler room (new construction) in parts Architecture, Constructions, Plumbing; Subproject 3 Canopy Box for pigs with a ramp (new construction) by parts Architecture and Constructions Subproject 4 The concrete base for the fertilizer lagoon (new construction) by parts Constructions; Subproject 5 The concrete base for the disinfection site (new construction) part Constructions; Subproject 6 The concrete base for construction of feed storage bins (new construction) - Structures; Subproject 7 Double openwork fence with a length of 605.40 l.m. (new construction) - Constructions; Subproject 8 Platform grid (Water Supply and Sewerage).
Overview
Status | Contracted |
---|---|
Start date | 21 Apr, 2022 |
End date | 01 Oct, 2023 |
Contract date | 21 Apr, 2022 |
Programme
Beneficiary
Financial information
Total cost | 972,001.19 |
---|---|
Grant | 486,000.60 |
Self finance | 486,000.59 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location