With the present project "AGRI.SSS" EOOD applies under sub-measure 4.1 "Investments in agricultural holdings" of measure 4 "Investments in tangible assets" of the RDP 2014-2020 for the purchase of technological equipment for rearing laying hens, specialized agricultural machinery - baler and specialized vehicle for transport of fodder for the needs of the livestock farm of "AGRI.SSS" EOOD. At the time of application "AGRI.SSS" EOOD grows 129,163 pcs. Commodity laying hens for eggs, for which there are two registered breeding sites - 3BG08745 intensive rearing in enlarged cages with a maximum capacity of 130,000 pcs. and 2BG08745 floor cultivation with a maximum capacity of 37,000 pcs. They are located in a common plot of land № 235001 on the land of the town of General Toshevo, district Dobrich with an area of 119,639 decares together with two other livestock sites of the applicant № 95000746 and 3BG08998 for growing laying hens respectively with capacities of 48 400 pcs. and 51,600, of which 70,000 are grown annually. bright for own breeding from day-old chicks up to 16 weeks, which replace the main laying hens at the age of 78 weeks. The technological equipment for growing laying hens will be installed in a livestock facility № 95000746 in order to switch entirely to cellular rearing of growing laying hens. The capacity of the new equipment will be up to 42,000 units. adolescents per batch, and after the implementation of the project the applicant will reach a maximum capacity of 93,600 pieces. adolescent cell culture."AGRI.SS" Ltd. raises adolescents to meet their own needs in order to feed adolescents in 16 weeks its two livestock farms for breeding laying hens. For the needs of the farm it is planned to purchase a specialized feed truck, which will distribute the feed between the individual buildings inside the livestock complex in order to eliminate the access of external vehicles in the livestock complex.
Overview
Status | Contracted |
---|---|
Start date | 07 Apr, 2022 |
End date | 01 Oct, 2023 |
Contract date | 07 Apr, 2022 |
Programme
Beneficiary
Financial information
Total cost | 731,832.43 |
---|---|
Grant | 365,916.22 |
Self finance | 365,916.21 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location