With this project proposal Stoyan Bogomilov Baev applies Selection procedure № BG06RDNP001-4.008 "Targeted admission for farmers in the livestock sector" under sub-measure 4.1 "Investments in agricultural holdings" of measure 4 "Investments in tangible assets" of the Rural Development Program 2014-2020 The farmer Stoyan Bogomilov Baev raises laying hens in an existing livestock farm, which consists of two buildings with capacities of 4,240 respectively. and 4,390 pcs. or a total of 8,630 pcs. The hens in the existing buildings are reared according to the "floor rearing" system. The current project proposal "Expansion of a poultry farm by building a new building for 18,375 laying hens, a fence and increasing the capacity of the existing manure storage and purchase of technological equipment in a property with identifier №05308.46.4, located in the village of Bolyarsko, municipality Tundzha, Yambol district ”envisages an increase in the capacity of the farm by 18,375 by building a new building for animal husbandry, which will bring the total capacity of the livestock facility to 27,005. laying hens. The new building, subject of the project proposal, envisages the introduction of a high-tech, automated system for raising laying hens of aviary (rack, free) type, which provides great freedom of movement, and the number of poultry in the building will be 18,375. laying hens. The chosen technology is modern, the processes are automated, and the equipment assumes the maximum long-term preservation of the purity of the fodder and drinking water of the birds. The microclimate in the building will be maintained by an integrated system with computer control. This guarantees optimal parameters of the microclimate, regardless of the seasonal variations in terms of temperature and humidity in the outdoor environment.
Overview
Status | Contracted |
---|---|
Start date | 13 May, 2022 |
End date | 01 Oct, 2023 |
Contract date | 13 May, 2022 |
Programme
Beneficiary
Financial information
Total cost | 972,754.97 |
---|---|
Grant | 486,377.46 |
Self finance | 486,377.51 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location