Modernization of a cow farm in the village of Cherven Breg, municipality Dupnitsa, obl. Kyustendil

The project is for modernization of an agricultural farm livestock farm for dairy cows with № 26290146 located in the village of Cherven Breg, EKKATE 80491. The purpose is to purchase equipment needed to service the farm, both for feeding animals and for cleaning pastures and meadows: Deutz-Fahr wheeled tractor, model AGROTRON 6215 RCSHIRT with 226 hp. is the necessary machine with appropriate power, equipped with the necessary attachments to lead to a competitively developed economy with reduced production costs, with increased profits. The tractor is a 4 * 4 version. Equipped with a rear suspension system with a load capacity of up to 9700 kg. with quick coupling (hooks) allows fast and trouble-free aggregation of attached equipment needed for work on the farm such as: shredder, etc. For this purpose the machine is equipped with Electronic control of the rear canopy from the fenders, as well as with 4 double hydraulic outlets. For work on rough terrain, such as the terrain of the farm and for the smooth and even distribution of food with the feed trailer, a machine with precise and smooth starting and better control when driving is needed. speeds, APS, Speed ​​Matching, Power shuttle with sense clutch and 5 reaction modes. Cruise control. To balance the whole machine is equipped with a block of weights of 1000 kg on the front canopy, Front fenders needed to prevent mud from throwing on the windshield in rainy weather and reduce visibility when driving. This saves extra processing time on the farm. The power is in accordance with the requirements of the attachments necessary for the modernization of the animal site. For comfort when working at high temperatures, the tractor is equipped with air conditioning, which allows the tractor driver to work in conditions that do not predispose him to rapid exhaustion and fatigue.

Comments
Leave a comment

Overview

Status Contracted
Start date 15 Apr, 2022
End date 01 Oct, 2023
Contract date 15 Apr, 2022
View in UMIS

Beneficiary

Financial information

Total cost 328,553.00
Grant 164,276.50
Self finance 164,276.50
Total paid 0.00
EU participation percent 85.0%

Location