Construction of a sheep farm in PI 77058.12.151, town of Hadjidimovo, municipality of Hadjidimovo, district Blagoevgrad

MATAND EOOD is the owner of a livestock farm with No. 7705880139 (veterinary registration 2933-0465), located on the land of the town of Hadjidimovo, Hadjidimovo municipality, Blagoevgrad district, where a total of 332 sheep and 29 goats are raised. The present project proposal aims at modernization of a livestock farm for dairy sheep breeding by building a sheep farm in PI 77058.12.151, Hadjidimovo, district Blagoevgrad. For the complete construction of the livestock farm a technical investment project has been prepared, which envisages the performance of the following construction and installation works: MAIN ENTRANCE, DISINFECTION PIT, MILKING SHEEP, FOOD STORAGE WAREHOUSE Tank for PBN, FERTILIZER LAGOON, Generator With this project proposal, only the construction of the Dairy Sheep Barn (part structures and part water supply and sewerage) and the Feed Storage Warehouse is applied for. The applicant will finance with its own funds the activities for construction and installation work for the construction of the disinfection pit, the tank for PBN, the manure lagoon, the generator, the stable for dairy sheep (architectural and electrical) and purchase of technological equipment for the sheep farm. The barn houses the main function of the sheep farm - a barn for up to 540 dairy sheep and their offspring. There are 540 sheep in the building, divided into 6 groups of 90 sheep each. For storage of the necessary quantities of animal feed, a food storage warehouse with an area of ​​1014 m2 is provided. MATAND Ltd. breeds dairy sheep of the Lacon breed. These breeds have very good characteristics. It is envisaged that the applicant will raise up to 540 dairy sheep, from which it will produce up to 199 tons of sheep's milk, which it will process completely and sell up to 49.95 tons of sheep's cheese per year. The total amount of the investment under the present project proposal is BGN 977,587.22 without VAT.

Comments
Leave a comment

Overview

Status Contracted
Start date 28 Mar, 2022
End date 01 Oct, 2023
Contract date 28 Mar, 2022
View in UMIS

Beneficiary

Financial information

Total cost 977,587.22
Grant 488,793.61
Self finance 488,793.61
Total paid 0.00
EU participation percent 85.0%