"Purchase of technological equipment for an existing livestock farm in Regulated Land VIII and IX, quarter 24, Rupkite village, Chirpan municipality, Stara Zagora region"

RINTIN EOOD is the owner of a livestock farm-cowshed with No. 6251-0099, located on the land of the village of Rupkite, Chirpan municipality, Stara Zagora district. This project proposal aims to modernize a livestock farm for dairy cows by purchasing technological equipment for the needs of the livestock facility, which includes: 1. FACILITY FOR MILK PRODUCTION AND EQUIPMENT FOR WASHING AND DISINFECTION - MILKING HALL TYPE 2X6 PLACES "PARALLEL" Brand: TDM, model: 2X6 In the milking parlor, 12 dairy cows can be milked at the same time. On average, 40 animals can be milked in 1 hour. The dairy cows available on the farm will be milked in about 2 hours, and after milking it is necessary to wash the milking installation, which takes about 1 hour on average. The farm provides 3 times milking and three cleaning of the milking system. Therefore, the facility for milk production and equipment for washing and disinfection - milking parlor type 2x6 places "parallel" is planned to be used for 9 hours a day with the available 78 dairy cows. 2. VENTILATION FOR COW STABLE AND WAITING ROOM FOR MILKING HALL BRAND: CMP Fans with a diameter of 5.00 meters for ventilation of a barn for cows - 8 pieces In order to improve the microclimate, high in the barn are provided 8 fans with a diameter of 5.00 meters. They are mounted high under the ceiling. 3. SCRAPER SYSTEMS FOR DISCHARGE OF FERTILIZER MASS - CHAIN ​​- 1 SET Brand: Beerepoot Model: Chain Scrapers The cake that falls off the animals is in the food and in the aisles. The cake is cleaned with scraper devices. 4. COW STAFF FIXERS BRAND: ROTA GUIDO "EXTRA" clamps for cows with anti-suffocation floating tubes, made of vertical and gripping tubes. With soundproofing seals and devices for selective capture and release of animals. 100 pieces

Comments
Leave a comment

Overview

Status Contracted
Start date 31 Mar, 2022
End date 01 Oct, 2023
Contract date 31 Mar, 2022
View in UMIS

Beneficiary

Financial information

Total cost 403,320.60
Grant 201,660.29
Self finance 201,660.31
Total paid 0.00
EU participation percent 85.0%

Location