RINTIN EOOD is the owner of a livestock farm-cowshed with No. 6251-0099, located on the land of the village of Rupkite, Chirpan municipality, Stara Zagora district. This project proposal aims to modernize a livestock farm for dairy cows by purchasing technological equipment for the needs of the livestock facility, which includes: 1. FACILITY FOR MILK PRODUCTION AND EQUIPMENT FOR WASHING AND DISINFECTION - MILKING HALL TYPE 2X6 PLACES "PARALLEL" Brand: TDM, model: 2X6 In the milking parlor, 12 dairy cows can be milked at the same time. On average, 40 animals can be milked in 1 hour. The dairy cows available on the farm will be milked in about 2 hours, and after milking it is necessary to wash the milking installation, which takes about 1 hour on average. The farm provides 3 times milking and three cleaning of the milking system. Therefore, the facility for milk production and equipment for washing and disinfection - milking parlor type 2x6 places "parallel" is planned to be used for 9 hours a day with the available 78 dairy cows. 2. VENTILATION FOR COW STABLE AND WAITING ROOM FOR MILKING HALL BRAND: CMP Fans with a diameter of 5.00 meters for ventilation of a barn for cows - 8 pieces In order to improve the microclimate, high in the barn are provided 8 fans with a diameter of 5.00 meters. They are mounted high under the ceiling. 3. SCRAPER SYSTEMS FOR DISCHARGE OF FERTILIZER MASS - CHAIN - 1 SET Brand: Beerepoot Model: Chain Scrapers The cake that falls off the animals is in the food and in the aisles. The cake is cleaned with scraper devices. 4. COW STAFF FIXERS BRAND: ROTA GUIDO "EXTRA" clamps for cows with anti-suffocation floating tubes, made of vertical and gripping tubes. With soundproofing seals and devices for selective capture and release of animals. 100 pieces
Overview
Status | Contracted |
---|---|
Start date | 31 Mar, 2022 |
End date | 01 Oct, 2023 |
Contract date | 31 Mar, 2022 |
Programme
Beneficiary
Financial information
Total cost | 403,320.60 |
---|---|
Grant | 201,660.29 |
Self finance | 201,660.31 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location