Purchase of technological equipment for a cow farm

LIMO BULS EOOD has built a livestock farm with a project under Sub-measure 4.1 "Investments in agricultural holdings" for breeding dairy cows and their offspring in the village of Nova Lovcha, Hadjidimovo municipality. Respectively, on 24.09.2020, LIMO BULS EOOD registered its livestock farm with Certificate No. 6059 / 24.09.2020. with a capacity of up to 100 pcs. cattle and 80 pcs. calves. This project proposal aims to modernize a livestock farm for dairy cows by purchasing technological equipment for the needs of the livestock facility, which includes: Concentrated ruminant feed production equipment. Brand: Skiold Receiving containers and transportation of raw materials to the mill Mill: • Skiold disc grinder with 15 kV motor and grinding capacity 4 t / h at a grinding size of about 6 mm. With integrated magnet at the entrance of the mill • U type auger under the mill for transporting the ground material from the mill to a lifting auger to the mixer. Made of metal and hot-dip galvanized. Capacity - about 6 tons / hour Mixer: • Lifting auger from U auger under the mill to the mixer - length up to 3 meters. Made of hot-dip galvanized metal. • Inclined mixer Uni-Mix 1000 with a capacity of 1000 kg - driven directly by a 4.0 kV motor; Average mixing time Micronutrient dosing: • Microelement hopper with grate and dosing auger - capacity - 400 liters; 75 mm flexible or metal auger and drive motor Storage of finished product: • Emptying auger from mixer to container for storage of finished product - capacity 10 t / h; electric motor; • 1 container for storage of finished product for outdoor installation - capacity - 12 m3 or about 7 tons; made of galvanized metal or fiberglass; • Screw for delivery of the finished product from a container for storage of the finished product to a mixer wagon (feed dispensing trailer) - made of metal, hot-dip galvanized; electric motor drive Electrical panel for central control

Comments
Leave a comment

Overview

Status Contracted
Start date 04 Apr, 2022
End date 01 Oct, 2023
Contract date 04 Apr, 2022
View in UMIS

Beneficiary

Financial information

Total cost 118,914.46
Grant 59,457.23
Self finance 59,457.23
Total paid 0.00
EU participation percent 85.0%

Location

Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Blagoevgrad (BG413), Hadzhidimovo, Nova Lovcha