Modernization of the agricultural holding of ILIA PARVANOV GALABOV

ILIA PARVANOV GALABOV is a registered agricultural producer, according to the requirements of Ordinance №3 / 1990. to establish and maintain the register of agricultural producers. With the implementation of the project proposal, the applicant will modernize a livestock farm located in the village of Noevtsi, municipality. Breznik, obl. Gingerbread. The project proposal includes the rearing of 100 calves for fattening. For the needs of the livestock farm and for the purpose of feeding the animals, the applicant is obliged to manage the following crops: 350 decares of wheat, 150 decares of corn for grain, 100 decares of natural meadows. With the implementation of the project proposal ILIA PARVANOV GALABOV envisages to fulfill the following investment costs: - Purchase of fixed assets - Tractor brand DEUTZ-FAHR, model AGROTRON 6140, with included additional equipment (air conditioning, front weights, front fenders, 3 double 3- hydraulic outlets) point rear canopy cat. II / III with increased capacity 7000 kg, driver's seat with dynamic air suspension, rear window wiper, rear canopy with quick coupling (hooks), Power beyond, automatic transmission Power Shift F30 / R30, electronic rear control fender canopy, mechanical cab suspension, front canopy and PTO; front loader, with additional equipment included: (very functional bucket (4 in 1), pallet fork, bucket for light materials); GPS navigation system and autopilot system; modem ; Autopilot system platform; Electric motor and autopilot system cabling; Correction signal for receiver; Receiver stand; Power cable for GPS navigation system long part; Power cable for GPS navigation system short part; Receiver antenna cable; Ram stand for navigation; Frame stand fasteners; Receiver stand mounts; Seed drill KVERNELAND Optima HD - ll e-drive.

Comments
Leave a comment

Overview

Status Contracted
Start date 30 Mar, 2022
End date 01 Oct, 2023
Contract date 30 Mar, 2022
View in UMIS

Beneficiary

Financial information

Total cost 302,776.13
Grant 151,388.07
Self finance 151,388.06
Total paid 0.00
EU participation percent 85.0%

Location