The project proposal envisages the implementation of construction and installation activities, which includes: I. BUILDING FOR BODY FATTENING The building has a minimum capacity for breeding 206 meat-producing calves for fattening. Before entering it, the calves will be reared all year round (together with the mother cows) up to 6 months of age and live weight 200-250 kg. The animals will stay in the building about a year to reach slaughter live weight 580-600 kg. It is envisaged that a total of 24 group boxes (12 in a row) will be located in two rows in the production building, and between 8 and 11 calves will be kept in each box. The number of calves in the boxes will decrease with increasing age and live weight. mass. The animals will be kept in the same box all the time - without moving, but will only be "diluted". II.LIQUID FERTILIZER SILOS The liquid manure silo has a cylindrical shape with a diameter of 24.75 m, height 4.17 m (3 horizontal rows of mounting sheets) at a volume of 2015 cubic meters. Its capacity is calculated to accommodate the compartments of all animals in the building manure, respectively diluted with water, for 4 months. The silo manure is pumped after homogenization and transported to pastures or agricultural areas through a liquid manure tank. III. Warehouses and hayloft They will be used for the needs of feeding the animals in the livestock site, the sizes of the Warehouses and the Hayloft are in accordance with the size of the farm. IV. ADMINISTRATIVE AND RESIDENTIAL BUILDING The management and functioning of the whole farm require the construction of a small administrative building in which to separate premises: for rest of the workers with bathroom and toilet to it, an office for the veterinarian, furnished with a lockable cabinet for veterinary drugs and medicines, as well as a room for the manager (manager) of the farm.
Overview
Status | Contracted |
---|---|
Start date | 31 Mar, 2022 |
End date | 15 Apr, 2022 |
Contract date | 31 Mar, 2022 |
Programme
Beneficiary
Financial information
Total cost | 855,532.00 |
---|---|
Grant | 427,766.00 |
Self finance | 427,766.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location