Project for "RECONSTRUCTION AND MODERNIZATION OF PUMP STATION, SERVING CANTON AND IRRIGATION INSTALLATION" BATEN ", as the irrigation facility is located in the town of Perushtitsa, Perushtitsa municipality. Characteristics of the Project Proposal: Reconstruction and modernization of the Baten irrigation system is envisaged, as the function, capacity and scope of all facilities will not change. Elements of the irrigation installation are owned by the municipality of Perushtitsa, as they are concessioned by MONKTRADE EOOD in order to provide a public service - irrigation. The facilities were built in 1963 - 1964. With the implementation of the project proposal it will be possible to provide the population with the service of irrigation of arable agricultural land in the land of Perushtitsa and Brestovitsa. The project proposal includes reconstruction and modernization of the following existing elements: • Water intake and supply channel from water intake to Baten dam - 2752 m. • Service canton with pumping station and drilling well) - located in the land property 325.31 with an area of 3.43 decares. • Irrigation pipelines: MAIN PIPELINE UCH.№1 F 315 L = 906.16 m. MAIN PIPELINE UCH.№1-1 F 315 L = 1424,91 m. IRRIGATION PIPELINE №1 F 110 L = 674.78 m. IRRIGATION PIPELINE №2 F 110 L = 1115.44 m. IRRIGATION PIPELINE №3 F 110 L = 1877.61 m. IRRIGATION PIPELINE №4 F 110 L = 1166.15 m. IRRIGATION PIPELINE №5 F 110 L = 845,54 m. IRRIGATION PIPELINE №6 F 110 L = 739.05 m. Building a system for prevention and response to harmful effects of water. Area of the irrigation facility 3361 decares Area that the irrigation facility can currently irrigate 0 decares Area that will be able to irrigate after the project 3361 decares Efficiency according to World Bank data 51% Current efficiency of equipment 0% Efficiency of the irrigation facility after the implementation of the project 95% Potential water savings with project implementation 95%
Overview
Status | In execution (starting date) |
---|---|
Start date | 28 Jun, 2022 |
End date | 28 Jun, 2025 |
Contract date | 28 Jun, 2022 |
Programme
Beneficiary
Financial information
Total cost | 2,403,646.33 |
---|---|
Grant | 2,403,646.33 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 75.0% |
Location