REPAIR, RECONSTRUCTION AND MODERNIZATION OF IRRIGATION SYSTEM "KUMANSKI DOL"

This project is a developed design solution for reconstruction and modernization of an irrigation system Kumanov Dol, through the reconstruction of the existing pipelines and their modernization in a pressure water supply network for water supply of the irrigation process of the irrigated massifs. Through the reconstruction, water supply will be provided to the individual areas of the reconstructed system. The project is consistent with the crops that will be traditionally grown within the scope of the irrigation facility. After the reconstruction and modernization, it will be possible for more agricultural producers to switch to growing intensive crops from the owners, tenants and water users of the irrigated areas. The total net area of ​​agricultural land included in the reconstructed irrigation system "Kumanski dol", subject of this project is 5 253 daa. In agricultural lands there are economic roads that separate the various massifs and blocks sown with crops. The current design development is fully consistent with the physical boundaries of the massifs, their terrain and more. characteristics and existing infrastructure in the area. The reconstruction of the linear network is located entirely on the existing routes of the irrigation system, as the obsolete as technology and time pipes are replaced with the same diameter pipes of modern materials. Technical project for "Repair, reconstruction and modernization of irrigation system Kumanski dol. The existing irrigation system "Kumanski dol" has a larger area, as an object of reconstruction and modernization of the project is 5,253 daa in size and is structured in 3 arrays, as the technical design is reflected as Stage 1 .:  Array 1 - 650 daa  Array 2 - 1 646 daa  Array 3 - 2 967 daa The area of ​​the irrigation system in the land of the village of Kovachevtsi is 2764 daa, and the area in the land of the village of Popovyane is 2 489.

Comments
Leave a comment

Overview

Status In execution (starting date)
Start date 28 Jun, 2022
End date 28 Jun, 2025
Contract date 28 Jun, 2022
View in UMIS

Beneficiary

Financial information

Total cost 2,747,709.84
Grant 2,747,709.84
Self finance 0.00
Total paid 0.00
EU participation percent 75.0%

Location