Delivery and installation of technological equipment for two silos

The current project proposal of "AGROLAND" Ltd. concerns the supply and installation of technological equipment for two Silos C1 and C2, with a total capacity of 2282 cubic meters, which will be installed in the site "Fodder kitchen and grain silos" located in LPR I - 93, 227 in the land of the town of Hadjidimovo, municipality. Hadjidimovo identical to PI with identifier 77058.5.154, locality "Petrovata" under KKKR of the town of Hadjidimovo, municipality Hadjidimovo, obl. Blagoevgrad. The silos will provide prevention and increase of safety during storage of fodder in the sheep farm. The silos will store cereals needed to feed the sheep, namely wheat, barley, triticale and maize. The two units Silos C1 and C2 with a total capacity of 2282 cubic meters, which will be installed in the site "Fodder kitchen and grain silos" located in Regulated Land I - 93, 227 in the land of Hadjidimovo, municipality. Hadjidimovo identical to PI with identifier 77058.5.154, locality "Petrovata" under KKKR of the town of Hadjidimovo, municipality Hadjidimovo, obl. Blagoevgrad will provide prevention and increase of safety during storage of fodder in the sheep farm. The capacity of the two silos is in accordance with the number of sheep raised on the sheep farm. The silos will store cereals needed to feed the sheep, namely wheat, barley, triticale and corn. The total capacity of the sheep farm is 1250 pcs. sheep. The daily requirement of highly productive Lacon sheep raised on the sheep farm is 2 kg. up to 2.5 kg. cereals per day and the corresponding amount of roughage. The annual required amount of cereals for feeding one sheep is 912.5 kg, and for 1250 pcs. sheep is 1,140,625 kg. With a relative weight of 0.65 of cereals in the two silos with a total capacity of 2282 cubic meters will be stored about 1754 cubic meters of cereals, which is about 76% filling of the silos.

Comments
Leave a comment

Overview

Status Contracted
Start date 26 Nov, 2021
End date 15 Sep, 2023
Contract date 26 Nov, 2021
View in UMIS

Beneficiary

Financial information

Total cost 390,920.00
Grant 195,460.00
Self finance 195,460.00
Total paid 0.00
EU participation percent 85.0%

Location