Construction of a Scout (aka ‘Green’) School "Belchinski Bears" in the village of Belchin, Samokov Municipality, Sofia Region

Within the property will be built a new building, will be repaired an existing garage and will provided a suitable shaping of the surrounding area. The site is a training center for work with children from 6 to 12 years old. The main directions of the program are linguistic preparation and mathematical disciplines. The training is in three groups, two consisting of six and one of four children. The first and second are respectively children from 6 to 8 and from 9 to 12 years of age. The third group is formed for training in Suggestopedia methods and may include children with special needs. Teachers are six. During the school year, the program provides an afternoon training with a total duration of three hours per day. During weekends and vacations, school hours are spread throughout the day as groups have an individual program. It includes hours of play, recreation, sports, reading and creative activity. At the request of the parents will be organized creative ateliers, hours of study of the environment, healthy eating. The conditions for inclusion of children with disabilities in the afternoon groups were created. Within the property is provided the possibility of parking two cars for visitors. A garage is available for a permanent vehicle that operates on the Scout ‘Green’ School. The measures to ensure an accessible environment include the parking space to the right of the garage, the approach with ramps, the entrance near the lobby, the toilet with additional equipment and corridors with a width of 1.2 m. Groups that can accept children with disabilities will be situated only on the first floor and in the afternoon 3-hour training. The company will acquire a language learning system for kids, which is defended with an utility model.

Comments
Leave a comment

Overview

Status Contracted
Start date 05 Jul, 2021
End date 15 Sep, 2023
Contract date 05 Jul, 2021
View in UMIS

Beneficiary

Financial information

Total cost 592,763.80
Grant 296,381.90
Self finance 296,381.90
Total paid 0.00
EU participation percent 85.0%

Location

Bulgaria, South-West and South Central Bulgaria (BG4), South-West (BG41), Sofia (BG412), Samokov, Belchin