With this investment, the enterprise will improve its operations by implementing planned investments and introducing new products, processes and technologies. According to the design and agreed with the architect of the Municipality of Belene project documentation is planned the construction of 2 buildings and one linear sub-project. The investment is provisionally divided into two stages: Stage 1: Investment intentions for which construction is applied for support. The costs of Stage 1 are included in the first interim payment - construction and assembly works and administrative and residential buildings, which are detailed in the attached technical documentation and concluded with the selected contractor. These are described in more detail in the descriptive part of this business plan. Stage 2: Investment intentions for which final payment assistance is applied for. The investments are related to the following works and equipment: The total built-up area of all buildings related to this project is as follows: Part - production premises - total area / m² / - 306.02 Part - administrative-residential premises - total area / m² / - 376.57 Part - Vertical Planning with Site Networks - Total Area / m² / - 1060 Part - existing building - total area / m² / - 229 The existing refrigeration equipment is being refurbished and expanded into a refrigeration plant that includes the following premises: 1. Administrative-household section: FIRST FLOOR: • outdoor recreation; • staircase; SECOND FLOOR: • three office spaces for manager, accountant and sales department; • meeting room; • staff room; • roof terrace with resting place; • service spaces (bathroom and toilet). SURNAME: • installation room 2. Production premises: FIRST FLOOR: • three separate work rooms; 3. Park development and development
Overview
Status | Contracted |
---|---|
Start date | 29 Sep, 2020 |
End date | 15 Sep, 2023 |
Contract date | 29 Sep, 2020 |
Programme
Beneficiary
Financial information
Total cost | 577,303.60 |
---|---|
Grant | 288,651.77 |
Self finance | 288,651.83 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location