Modernization and equipment of a furniture production workshop

"The following assets will be purchased: Machining machine CEHISA PRO 12 CONCERT Holds aggregates to perform all the required workpiece edging processes. It saves time - without the need for additional processes involving manual labor. CNC POINT K2 920 POINT K2 TOP with BAR NESTING® is the suitable machine for small and medium-sized companies with a low investment budget, limited production and warehouse space, creating problems with the handling of large plates and limited staff POINT K2 TOP with BAR NESTING®: PEST TIME -gt; short processing times without inter-operational transport; PESTI PLACE -gt; occupies only 5 m2 with work area up to 15 m2 for organization; PESTS STRENGTH AND NEVER -gt; easy to work and service; PASSENGER FUNDS -gt; Extremely price / technological opportunity ratio; Solid fuel boiler CSA Marina 100kW Heating of production premises. It will replace the existing heating installation with a new one. Use of waste from production and other wastes such as shells, stones, etc. similar. Buffer vessel 750L Equipment for the heating system Closed expansion vessel V = 150l Equipment to the heating system Pump DN80, Flanges, 17m3 / h, 7mH2O Equipment for the heating system Pump DN80, Flanges, 17m3 / h, 4mH2O Equipment to the heating system Cabin ventilation convector type 5,24kW Equipment for the heating system. Making faster heat exchange. The newly purchased assets will increase productivity by optimizing the time for processing the details, assembling them and assembling them to get a finished product. Higher edge quality will be achieved, resulting in a better appearance of the product and a longer life span. Construction of a HVAC installation and the purchase of a solid fuel boiler will lead to an improvement in the production microclimate in the rooms, which can be used to heat out waste from production.

Comments
Leave a comment

Overview

Status Contracted
Start date 31 Aug, 2020
End date 31 Aug, 2022
Contract date 31 Aug, 2020
View in UMIS

Beneficiary

Financial information

Total cost 182,520.00
Grant 91,260.00
Self finance 91,260.00
Total paid 0.00
EU participation percent 85.0%

Location