IMPROVEMENT OF THE ECONOMIC DEVELOPMENT AND STRENGTHENING OF THE HOLDING OF IVELIN LYUICHEV PAPADOV

The farmer carries out his agricultural activity entirely in the land of the village of Lesicheri, which is not included in the list of mountainous disadvantaged areas. In the current agricultural year the farm is cultivated 3.000 decares of stone fruit species-plums and 91 PCs. Colonies. The economic size of the holding is 7989.45 Euro SPO. The utilised agricultural areas are managed under irrigation conditions. In case of adverse climatic conditions/drought/water is used from the built irrigation system servicing the village. Stopanisvaniât property is used on the basis of a signed rental agreement, which is notarized and entered in the registry agency registered in the "Agriculture" AXIS. The farm is located in the nitrate vulnerable zone, as it is located on the territory of the municipality of Pavlikeni. The properties that are managed do not fall within the boundaries of a protected area within the meaning of the Act to protected areas and within the boundaries of protected zones under the Biological Diversity Act. The terrain of the utilised agricultural area is equal. Access is not difficult. All agricultural crops and bee colonies are kept conventionally. The farmer has no contract for control and certification for organic production. The beekeeper is located in the orchard. The farmer has a certificate of registration on a holding. The site is entered in the register of the holdings of OBICH-Veliko Tarnovo. The beehives with which the works are "Farir " System. All of them are numbered according to veterinary checks. No mobile beekeeping has been practised so far. The plums are the Stenley variety. The applicant has not submitted applications for support under the direct payment schemes and measures. The farmer himself organizes and manages his activities. No production personnel are assigned to the holding. No accounting records are currently being kept. The farm does not have its own agricultural machinery.

Comments
Leave a comment

Overview

Status Contracted
Start date 18 Mar, 2021
End date 18 Sep, 2025
Contract date 18 Mar, 2021
View in UMIS

Financial information

Total cost 29,337.00
Grant 29,337.00
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location