Growing perennials

The farm is plant-growing. Plum orchards are grown on an area of ​​10,800 acres. The farm is located on the territory of two lands in Teteven municipality. Four properties with a total area of ​​18,271 acres are used, of which 10,800 acres are cultivated. The property with an area of ​​3,499 is its own and is located in the village of Glozhene, municipality. Teteven region Lovech. Of the total area of ​​the property of 3,499 decares and the old cadastral number 15165.30.18, the newly planted orchard is located on an area of ​​2,499 decares.The breeding establishment with an area of ​​1,000 has cadastral number 15165.30.512 and is currently being leased to third parties. The fruit plantation is separated into a separate property with an area of ​​2,499 and cadastral number 15165.30.513. It is part of the farmer's farm. Properties with an area of ​​5,480 acres and an area of ​​8,464 acres are managed for rent. From a property of 5,480 acres, 3,900 acres are cultivable. From a property with a total area of ​​8,464 acres, 3,001 acres are cultivable. The property with an area of ​​1,828 acres is for rent with a legal basis for one business year. The last three properties are located in the land of Teteven municipality, Teteven municipality, region. Lovech. Some of the farm's properties are within the scope of Natura 2000 and protected areas. The agricultural lands of the farm are part of the territorial scope of the mountain disadvantaged areas in Bulgaria. The orchards located on their own property are newly planted, with an average number of trees per hectare of 40, while the rest are older and fruitful at an average density in the area of ​​37 to 40. trees. The areas are not irrigated. There is no natural water source near the farm. The farm terrains are sloping and the area is characterized by high rainfall. Fertilization is done in the fall only with manure. The areas in the row of permanent crops are mowed and the soil surface is maintained by grass.

Comments
Leave a comment

Overview

Status Contracted
Start date 19 Mar, 2021
End date 19 Sep, 2025
Contract date 19 Mar, 2021
View in UMIS

Financial information

Total cost 29,337.00
Grant 29,337.00
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location