IMPROVEMENT OF THE ECONOMIC DEVELOPMENT AND STRENGTHENING OF THE HOLDING OF HRISTO HRISTOV

The farmer carries out his agricultural activity in two neighbouring territories-Zdravkovets and Kozi Rog, Gabrovo Municipality, included in the list of mountainous disadvantaged areas. In the current agricultural year 10.698 decares of stone fruit species-plums are grown on the farm. The economic size of the holding is 7750.71 Euro SPO. The utilised agricultural areas are managed under irrigated conditions. There are no irrigation systems, as well as water sources. All managed properties are used on the basis of concluded lease agreements, which are notarized and entered in the registry agency registered in the "Agriculture " AXIS. The farm is not located in the nitrate vulnerable zone because it is located on the territory of the municipality of Gabrovo. The properties that are managed do not fall within the boundaries of a protected area within the meaning of the Act to protected areas and within the boundaries of protected zones under the Biological Diversity Act. The terrain of the utilised agricultural areas is slightly sloped. Access is not difficult. All agricultural crops are grown conventionally. The farmer has no contract for control and certification for organic production. The applicant has not submitted applications for support under the direct payment schemes and measures. The farmer himself organizes and manages his activities. No production personnel are assigned to the holding. No accounting records are currently being kept. The farm does not have its own agricultural machinery. Use external services if necessary. Plant protection products and fertilisers shall not be stored on the holding. No diary of chemical treatments and used fertilizers, soil improvers and biologically active substances is kept. No risk assessment has been developed at this time.

Comments
Leave a comment

Overview

Status Contracted
Start date 22 Mar, 2021
End date 22 Sep, 2025
Contract date 22 Mar, 2021
View in UMIS

Financial information

Total cost 29,337.00
Grant 29,337.00
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location