abina Yonkova performs agricultural activity entirely on the territory of the village of Armenite, on the territory of Gabrovo Municipality, Gabrovo District. Armenian land is not included in the list of designated mountain areas as disadvantaged. The managed property does not fall within the boundaries of a protected area within the meaning of the Protected Areas Act and within the boundaries of protected areas within the meaning of the Biodiversity Act. According to the latest data from the Questionnaire and the Farmer's Questionnaire, 3,300 acres of plums and bee families - 87 units are grown on the farm this year. The economic size of the holding is EUR 7951,15. Permanent crops are young, unproductive. They are in their own property with number 017069, with a utilized agricultural area of 3.3 decares. The farmer has a certificate of registration of the animal holding with veterinary registration number 5347B-0046. The bee hives that are used are the Langstrot - Ruth, Farrar and Dadan Blat system and are numbered according to veterinary requirements. All crops and bee families are grown conventionally at the time of application under sub-measure 6.3. There are no production staff assigned to the farm. At the date chosen for the verification of the implementation of the business plan, the holding will be EUR 10188.05. The number of bee families raised through their own breeding activities will increase. In 2021, bee families will increase by 35. Plum areas will be maintained throughout the period of 3,300 acres. A risk assessment will also be carried out in 2020 to identify the hazards associated with work, the work process and the work environment, in accordance with the requirements of the Health and Safety at Work Act. A logbook of chemical treatments and fertilizers used, soil improvers and biologically active substances will also be started in 2020. In 2020, the farmer will purchase a printing machine.
Overview
Status | Contracted |
---|---|
Start date | 16 Mar, 2021 |
End date | 16 Sep, 2025 |
Contract date | 16 Mar, 2021 |
Programme
Beneficiary
Financial information
Total cost | 29,337.00 |
---|---|
Grant | 29,337.00 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location