„ Rehabilitation and reconstruction of streets in the town of Gramada”

The project proposal includes the implementation of activities for the restoration and improvement of the transport performance and loadability of the pavement and the road body of sites from the public infrastructure of the Municipality of Gramada. Construction and repair works for reconstruction of street pavements and pavements including preparatory works, earthworks, road works, asphalt works, drainage, horizontal marking and vertical signaling of the following objects from the street network of Gramada: 1. “Rehabilitation and reconstruction of "Todor Toshkov" Street from axis 383 to axis 425 in the town of Gramada” 2. “Rehabilitation and reconstruction of “Traicho Kostov” Street from axis 262 to axis 193 in the town of Gramada” 3. “Rehabilitation and reconstruction of “Strandja” Street from axis 275 to axis 258 in the town of Gramada” 4. “Rehabilitation and reconstruction of “Alexander Stamboliski” Street from axis 252 to axis 254 in the town of Gramada” 5. “Rehabilitation and reconstruction of “Traicho Kostov” Street from axis 262 to axis 193 in the town of Gramada” In connection with the implementation of the investment in the scope of the project are planed the following activities: 1. Implementation of construction supervision during the construction works on the sites within the scope of the project, according to Art. 166 of the TDA 2. Carrying out author's supervision during the construction works on the sites within the scope of the project 3. Project Management in accordance with the Terms of Reference for this Procedure.

Comments
Leave a comment

Overview

Status Contracted
Start date 09 May, 2019
End date 09 May, 2022
Contract date 09 May, 2019
View in UMIS

Financial information

Total cost 1,172,453.64
Grant 1,172,453.64
Self finance 0.00
Total paid 1,170,792.44
EU participation percent 85.0%

Location