Reconstruction of the streets "Topola", "Benkovski", "Shipka", "Tsar Simeon", "Al. Stamboliyski", "Djemina", and "V. Borimechkov" in the village of Anton, Anton Municipality

In the municipality of Anton, as well as in the majority of the municipalities in the country, exist overcome economic, social and demographic problems, which are difficult to overcome. In the territory of Anton Municipality the potential and mobilized internal resources should be utilized to meet the needs of the local community, to develop a competitive local economy, to modernize the existing agriculture and to develop the municipality as a whole. As a prerequisite, the street network has a structural importance for the economy of the village of Anton. The Anton Municipality's vision of development is to develop and become an attractive place to live and work, providing a good living environment, attracting and retaining its population with a competitive, diversified local economy supported by a socially responsible and competent local government and administration . Effective street network repairs are fundamental to the municipal administration's social, economic and development policy, travel comfort and traffic safety, reduced transportation costs and maintenance costs for the street network. The project proposal plans reconstruction of street pavements, sidewalks and curbs in the village of Anton. The underlying streets of the project are the main arteries in the settlement and connect the settlement with a higher class road, which means that they have to be in good and safe condition, which is a prerequisite for attracting investments and promoting employment. Besides the reconstruction of the street network, activities are planned for supervision and project management. The project design and development activities are currently being assigned and implemented.

Comments
Leave a comment

Overview

Status Contracted
Start date 17 Sep, 2020
End date 17 Sep, 2023
Contract date 17 Sep, 2020
View in UMIS

Financial information

Total cost 966,756.97
Grant 966,756.97
Self finance 0.00
Total paid 0.00
EU participation percent 85.0%

Location