The project envisages the development of 19 streets with a total length of 3 818.41 m on the territory of the municipality of Georgi Damyanovo in the villages of G. Genovo, G. Damyanovo, Govezhda and Kopilovtsi. The project is designed to improve road pavement due to abrasion of dense asphalt concrete, degraded flatness, many partial repairs on the pavement and many line and mesh cracks on the pavement. For this purpose, reconstruction and improvement of the existing street pavement and drainage are envisaged, in order to provide conditions for traffic safety, comfort of the passengers and prolongation of the operational life of the streets. The drainage of the streets is carried out with appropriate longitudinal and transverse slopes and existing rainfall.
Overview
Status | Contracted |
---|---|
Start date | 31 Aug, 2020 |
End date | 31 Aug, 2023 |
Contract date | 31 Aug, 2020 |
Programme
Beneficiary
Financial information
Total cost | 1,165,058.74 |
---|---|
Grant | 1,165,058.74 |
Self finance | 0.00 |
Total paid | 0.00 |
EU participation percent | 85.0% |
Location